Hillsborough County

Design-build in Westchase

Westchase is one master-planned community made up of many villages, laid out in northwest Hillsborough County from the early 1990s, with some villages now about thirty years old and others finished in the 2000s. That age makes it a busy place for second projects: a pool for a yard that never had one, a cabana beside a pool that is already there, or an ADU for a parent or a grown child.

What sets Westchase apart from the areas around it is how consistent the rules are. One community association reviews exterior changes across all the villages, and each village keeps its own look and lot pattern inside that framework. A plan that passes easily on a golf-course lot can need a different approach in a village with narrow, alley-loaded lots, so every project starts from the specific village.

Permitting and approvals in Westchase

Reviewed by Hillsborough County (unincorporated) building services

  • •Westchase is unincorporated Hillsborough County. Building permits, zoning and inspections go through the county; there is no Westchase city government or building department, even though Westchase homes carry a Tampa mailing address.
  • •Exterior changes need approval from the Westchase Community Association's Modifications Committee before work begins, and its guidelines cover pools, screen enclosures and accessory structures. Homes in villages with their own sub-association go through that village's review first. We prepare the application and place that review on the schedule ahead of the county submittal.
  • •Many villages also have their own neighborhood-level standards or representatives who weigh in on what fits the village. Two homes on either side of a village boundary can face different expectations for roof style or fence placement, so we check both the community-wide rules and the village's own.
  • •Westchase was developed with a Community Development District that owns its ponds, parks and conservation areas and maintains the gates and roads of most gated neighborhoods. Its drainage and maintenance easements around ponds and along lot lines appear on the plat, and pool decks, footings and screen enclosures have to stay clear of them whatever the association approves.
  • •Lots on the golf course or beside conservation land can carry extra limits on fencing, screen enclosure height or structures near the rear line, intended to protect open views. We read those plat notes and association rules before drawing anything.

Site conditions that shape the scope

  • •In the older, larger-lot villages, rear yards often have room for a pool and a cabana together, but side yards are tight and fences sit close to the property line. Getting excavation equipment into the backyard without crossing a neighbor's lot is confirmed during pre-construction.
  • •The newer, traditional-style villages such as West Park Village were built with smaller lots, homes close to the street and garages on rear alleys. Those yards suit compact pools and cabanas, and they turn deliveries and staging into a genuine logistics question.
  • •Many Westchase lots back onto ponds, lakes or wetlands. The water's edge brings drainage easements, a higher water table and sometimes wetland setbacks, all of which affect pool depth, footing design and where excavated soil can be stockpiled.
  • •Homes from the early 1990s are reaching the age when roofs, pool shells, screen enclosures and original electrical service come due. When a pool, a cabana or an ADU goes in, we check whether the panel and service can carry the new load and whether the existing lanai structure is worth keeping.
  • •Street trees and landscaping planted when the community was built have grown large. Protecting their roots and planning truck and equipment access around them is part of the site plan from the first visit.

Every Westchase project runs through The Watermark Way™ — feasibility first, stamped engineering, frozen selections, a documented punch walk before handoff, and a shared project schedule, documents and photos in our client project system.

See our process