Rough-ins discovered after the slab is poured
Gas, water, and electrical rough-ins are coordinated before any concrete is placed, because that is the decision that cannot be undone cheaply.
Built as one connected project
Most backyard projects happen in pieces: a pool company, then a pavilion builder, then a landscaper, each on their own schedule, each unaware of what the others are doing. The result is usually three good elements that don’t quite work as one space. We design full outdoor living projects the opposite way: gas, water, and electrical rough-ins are coordinated before any slab is poured, and the pavilion, pool, and hardscape trades are sequenced on a single critical path, because they’re one project, not three.
Appliance, grill, and stone selections are finalized at the Garrison House showroom during Pre-Production, locked before construction starts, so the kitchen, the pool deck, and the pavilion roofline are chosen to work together, not matched up after the fact.
Who this is for
What we remove
Gas, water, and electrical rough-ins are coordinated before any concrete is placed, because that is the decision that cannot be undone cheaply.
Pavilion, pool, and hardscape trades are sequenced on one critical path, so the deck is not poured before the equipment that has to cross it.
Access, impervious surface budget, drainage, and footing locations get decided once, at master plan, instead of being revisited with every new phase.
Every Outdoor Living project runs through The Watermark Way™ — feasibility first, stamped engineering, frozen selections, and a zero-defect handoff tracked live in the Watermark Portal™.
See our processWe do not take small patio pours, screen-enclosure-only, outdoor-kitchen-only, or fire-feature-only projects. Those scopes are real work, but they are single-trade work — and our estimating, permitting, engineering, and scheduling systems exist to protect projects where several trades have to land in the right order.
When a backyard is designed as one environment, the expensive decisions get made once: equipment access, impervious-surface budget, gas and electrical capacity, drainage, and where footings can go without fighting a future pool deck. Built piecemeal, those same decisions get made three times and reversed twice.
If you are planning one element now and more later, we can still help — we master-plan the finished yard and build it in phases, so the first phase does not make the next one cost more.
Project photos






















Common questions
Where we build it